Skip to content
View in the app

A better way to browse. Learn more.

ParkCrafters

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (โ‹ฎ) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

PS Vision Gaming

Members
  • Joined

  • Last visited

  1. The main staircase has now been fully developed and equipped with various detailed features, including lighting, fire safety systems, and other functional elements. As this area experiences a high volume of pedestrian traffic, I chose to place the seating areas exclusively along the walls. This keeps the circulation route spacious and easy to navigate, while still providing visitors with comfortable places to sit and relax.
  2. In this update, I built the elevators. The doors remain closed because this is the location where people can access the next floor. The elevators have also received several additional details.
  3. At the moment, I am working on the layout of the main staircase area, where the elevators are also located. For now, I am mainly focusing on the overall structure and positioning of the area before adding smaller details and decorations in later updates.
  4. In this update, I further detailed the secondary stairwell. Particular attention is given to fire safety, lighting, and way-finding, as well as a custom-designed railing for the staircase.
  5. The idea was well intended, but several steps of the metal staircase were not properly aligned, which meant my staircase was not entirely accurate either. As a result, I had to make some adjustments.
  6. This is the layout for the secondary stairwell. As the spawn point will be situated here, I needed a practical way to keep it out of sight. To achieve this, I decided to integrate a storage room into the design. Upon further review, I found that the space around the staircase, both at the upper and lower landings, felt somewhat cramped. I plan to address this in the next update, where I will also start working on the detailed finishing touches.
  7. Thank you so much. I'm glad you like the ceiling. It certainly wasn't easy to add enough detail, especially given the large surface area involved.
  8. To improve traffic flow, the entrance and exit ramp was designed with a raised curb along the roadside to better guide vehicles. The area has been further enhanced with additional detailing. Guardrails have also been installed at several parking spaces near the ramp to improve safety.
  9. Copying the floor itself isnโ€™t too difficult. The only downside is that I have a second parking garage, and transferring everything over to that one is much less enjoyable.
  10. To access the next parking level, the existing parking garage ramp needs to be modified. After this adjustment, the ramp can be used for the entire parking garage.
  11. The final objects for the parking deck are being placed. The jet fans provide ventilation by removing exhaust fumes and other harmful gases. In case of fire, they help guide the smoke towards the ventilation system. Above each parking space, indicator lights show whether a spot is free or occupied, perfect for quickly finding a space during busy moments.
  12. At the beginning of the garage build, I originally planned to keep it straight. However, I changed this at the last moment, which created more depth in the design. The additional details I added help to enhance this effect. At the same time, I deliberately kept certain areas more simple, which actually contributes to a more realistic appearance. Initially, I also ran into an issue with the ceiling, as it looked rather plain and solid. Fortunately, the garage allowed for a more open structural approach. By adding elements such as a sprinkler system and drainage pipes, I was able to break this up, resulting in a much more dynamic and realistic overall look.
  13. In this update the ceiling receives additional technical detailing with the installation of a fire sprinkler system. Elements like this are commonly used in real parking structures and make the environment feel more authentic.
  14. The details on the floor and the walls have now been completed, marking an important step in finishing the area. The next stage is to work on the ceiling. The first step is installing the ceiling itself, followed by the lighting. These elements form the foundation for the remaining details and will ensure proper visibility and atmosphere in the garage.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions โ†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.