Jump to content
View in the app

A better way to browse. Learn more.

ParkCrafters

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

PS Vision Gaming

Members
  • Joined

  • Last visited

Everything posted by PS Vision Gaming

  1. The Mobile Light Tower is the small project I mentioned last week. The exterior shape of the trailer has now taken form. In this update, I'm working on adding detailed elements to the chassis, including the coupling system, wheels, lighting, and stabilizer legs.
  2. Around the viaduct, I have added several details. Arrows have been placed on the road to guide traffic towards the exit and the overflow parking area. Outside the map, there is an additional exit for the overflow parking area, allowing the direction of traffic to be adjusted during quiet periods. Additionally, I have started installing fences. These prevent unauthorized persons from accessing the parking lot and garage at night, and also ensure that no one can walk from the parking area onto the highway. Since a new update is coming soon that will enable the removal of curbs, a feature I need for certain areas around the viaduct. I have decided to pause further development on this map for now. Therefore, starting next week, you will see a smaller project from me, which I can later incorporate into my main project.
  3. In the previous update, I showed that I was working on the interior of the viaduct. The colors I used there have now been extended to the exterior as well, along with some decorative lighting elements. I've also added several advertising displays promoting the various shops in the map.
  4. Here, I'm cladding the viaduct leading to the overflow parking area. Since this tunnel is used by the park, it has been finished in the park's signature colors. To give the viaduct a modern look, decorative lighting has been added. In addition, security cameras and functional lighting have been installed. https://youtu.be/CO2O0YBtwXg
  5. With this final update, the work around the bike lane and the viaduct is now complete. The entire area has been decorated with roadside weeds and bushes, creating a natural atmosphere. https://i.imgur.com/K7AF2sb.jpg
  6. I added road markings to the bike lane and built a viaduct beneath the on-ramp to the highway. I also added several details to the highway itself, including a cabinet for the lighting and a staircase leading up to the monitoring equipment along the highway. https://youtu.be/21tr-dr9S3o
  7. In this update, I added roadside weeds around the intersection and the overpass. To maintain clear visibility and ensure traffic safety, no trees were placed near the intersection. Additionally, the layout of the bike Lane has also been constructed. https://youtu.be/5SFu_3QVRYM
  8. To ensure the proper functioning of the traffic lights and street lighting, I have installed several Installation Traffic Control System Cabinets. Additionally, I have also installed several traffic lights along the bike la https://youtu.be/4UeRfSvYmms
  9. In this update, I have added more details to the overpass. For the safety of the traffic passing underneath, lighting has been installed. Additionally, the viaduct has been given a slightly neglected appearance, with old posters and litter under the tunnel.
  10. The side where the on-ramp and off-ramp are located has been further decorated with additional roadwork equipment. This includes several signs and an extra barrier. Additionally, roadside weeds have grown between the median. https://youtu.be/olcU65FVOpM
  11. In this update, I have installed traffic lights and put up traffic signs. Unfortunately, the traffic lights are not working yet because the lighting cannot be connected to the sequencer. Additionally, the intersection is now equipped with street lighting. https://youtu.be/SQ9m_ozkxNs
  12. In this update, I have added additional direction signs displaying distances in kilometers. Additionally, I have designed various manhole covers for different infrastructures. https://youtu.be/is-NDwl0fbE
  13. I have placed the final signs at the intersection, including a sign for the correct driving direction, a priority road sign, and several directional signs. Additionally, I have put the finishing touches on the road markings. This included adding various arrows and a triangle to warn of the priority road. https://youtu.be/2BbGx58a9_s
  14. I have started placing traffic signs at the intersection, including priority signs, prohibition signs, and some directional signs. The remaining signs will be added in the next update. Unfortunately, the signs currently look odd because the LODs of the font piece I’m using don’t work properly. I hope this will be improved in future updates. https://youtu.be/l3YpLdvo_Ag
  15. After spending some time working on the highway and its on- and off-ramps, I am now starting on the intersection. The first step is to apply the road markings. Additionally, the most important part of the intersection has been paved with bricks.
  16. Thank you. It indeed offers a beautiful view of the park's skyline, which makes you even more eager to visit the park, especially if that’s your intention. Until you take the exit and end up at the back of the traffic jam 😉
  17. Since most of the area around the on- and off-ramp still needs to be built or adjusted, I am only placing Roadside weeds in the one spot that is already finished is the embankment between the highway and the on- and off-ramp.
  18. In the previous update, I mentioned that the on and off ramps are still under construction. To make this even clearer, traffic guide beacons and traffic cones have been placed. Additionally, streetlights have been installed around the on and off ramps, which also extend partially along the highway itself. The streetlights are slightly shorter than the ones on the highway.
  19. Around the on- and off-ramps, I have installed guardrails at specific locations to ensure safety. Additionally, various traffic signs have been placed for both safety and navigation. Since roadworks are currently underway, the temporary yellow/orange markings are still visible.
  20. Due to Christmas and New Year's, I had little time to work on the project (as I usually work ahead on episodes). As a result, I only managed to add some graffiti to the noise barrier and finalize the design of the highway on- and off-ramps.
  21. In this episode, I add vegetation along the highway and behind the noise barrier. Additionally, I make a monitoring cabinet to measure traffic flows.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.